New Construction permits in Chicago
323 new construction permits filed in Chicago in the last 90 days — tracked from official city records, checked every 10 minutes. Built for general contractors and suppliers.
Most active new construction contractors in Chicago
By permit volume over the last 90 days — contractors of record on city filings.
| Contractor | Permits |
|---|---|
| SKIFFINGTON, DAVID PATRICK | 81 |
| WILMOT, ADAM R | 46 |
| SIDA, ANGEL | 11 |
| MOLLOY ELECTRICAL CO | 10 |
| STERNIUK, PETER | 10 |
Recent new construction filings
PROPOSED 3 STORY/6 UNIT RESIDENCE W/ROOF DECK/ENCLOSURES, REAR 3 STORY STAIRS TO ROOF, REAR 1ST FLOOR PORCHES AND 2ND/3RD FLOOR DECKS, AND 6 CAR GARAGE W/ROOF DECK AND PERGOLA, PE…
PERMIT EXPIRES ON 10/07/2026 ERECTION STARTS: 8/23/2026, ERECTION ENDS: 8/23/2026. CBC 2019. 2026 CHICAGO TRIATHLON TENT ON AUG 23. SETUP AUG 23 AND TAKEDOWN AUG 23, 2026. 1-20X80…
SELF CERT 2019 CBC NEW 3 STORY, 3 DWELLING UNIT RESIDENTIAL BUILDING, NEW 6'-0" HIGH FENCE AND NEW 3 CAR CONCRETE PARKING PAD.
SELF CERT 2019 CBC NEW 3 STORY, 3 DWELLING UNIT RESIDENTIAL BUILDING, NEW 6'-0" HIGH FENCE AND NEW 3 CAR CONCRETE PARKING PAD.
NEW TWO STORY FRAME (VA CONSTRUCTION, R-5 OCCUPANCY) SINGLE FAMILY RESIDENCE WITH BASEMENT, NEW FRONT OPEN CONCRETE LANDING WITH STAIRS. NEW PENTHOUSE AS A ROOF ACCESS TO PRIVATE R…
SELF CERT 2019 CBC NEW 3 STORY, 3 DWELLING UNIT RESIDENTIAL BUILDING, NEW 6'-0" HIGH FENCE AND NEW 3 CAR CONCRETE PARKING PAD
SELF CERT 2019 CBC: FULL BUILDING PERMIT FOR 2 STORY SINGLE FAMILY RESIDENCE WITH BASEMENT, ROOF ACCESS, ROOF DECK, REAR DECK, FRONT PORCH, DRIVEWAY, ATTACHED GARAGE WITH 2 PARKING…
PERMIT EXPIRES ON 10/07/2026 ERECTION STARTS: 8/11/2026, ERECTION ENDS: 8/18/2026. SELF CERT. CBC 2019. REINSTATEMENT OF 2025 PERMIT 101072645 FOR THE SAME TWO ASSEMBLY TENTS FOR …
DDS 2019 CBC DDS 2019 CBC: FULL BUILDING PERMIT FOR 5 STORY 40 D.U. BUILDING WITH BASEMENT, 21 CAR GARAGE AT 1ST FLOOR, 3 EXTERIOR PARKING SPACES ON CONCRETE PAD, DECK AT 2ND STORY…
PERMIT EXPIRES ON 10/07/2026 ERECTION STARTS: 8/23/2026, ERECTION ENDS: 8/23/2026. REINSTATEMENT OF 2023 PERMIT 101025797 FOR THE 20264 FIREFEST STAGE ON AUG 23, 2026. SAME 1-24X2…
Get new construction permits in Chicago the minute they're filed
Free account gets you this data on a 7-day delay. Paid plans deliver in real time — filtered to your trade, ZIP codes, and job size. See pricing →
Start free