Electrical permits in Santa Clara
193 electrical permits filed in Santa Clara in the last 90 days — tracked from official city records, checked every 10 minutes. Built for electricians.
Recent electrical filings
upgrade from existing original 100 amp overhead panel to 200 amp overhead panel.
remove existing 100 mp meter main panel and replace with new 200 amp siemens meter main panel. same location
remove existing 100 mp meter main panel and replace with new 200 amp siemens meter main panel. same location
E01 - REMOVE AND REPLACE EXISTING WALL SIGN, FACE/HALO LIT CHANNEL LETTERS ON PANEL EQUALING 12.4 SQFT E08 - FACE REPLACEMENT ON EXISTING FREESTANDING SIGN, TWO FACES REQUIRED, EQU…
Rewire property into main panel.
Meter main electrical panel upgrade from 100amp to 200amp. Same location
1. Upgrade current 200A main panel to 200A smart panel 2. install level 2 EV charger 3. Install 2 new outlets, one for future electrical water heater, one for future washer
Replace existing 100A main panel in existing location. Like-for-like service replacement with no increase in service capacity.
Laundry addition, tapping into H&C water, drains, and electrical, see master plan BLD25-04357. 32-D (2x2)
Replace existing 100A main panel in existing location. Like-for-like service replacement with no increase in service capacity.
Get electrical permits in Santa Clara the minute they're filed
Free account gets you this data on a 7-day delay. Paid plans deliver in real time — filtered to your trade, ZIP codes, and job size. See pricing →
Start free