ADU permits in Washington DC
13 adu permits filed in Washington DC in the last 90 days — tracked from official city records, checked every 10 minutes. Built for ADU builders and property managers.
Recent adu filings
12 DCMR Subtitle F, DC Plumbing Code, adopting 2015 IPC ? 405.3.1 There shall be not less than a 21-inch (533 mm) clearance in front of the water closet, urinal, lavatory or bidet…
ALTERATION and ADDITION to an existing 2-story plus basement, detached single family dwelling (no change in use). Demolish existing front porch, rear-deck and entire existing roof…
Selective demo of existing one-story brick garage. The owner will renovate the garage into a two-bedroom, two-bathroom, two-story accessory dwelling unit (ADU).
Remodel Existing Kitchen, Primary Bath and Hall Bath Add a New Powder Room and Hall Bathroom. NO Change to Exterior Windows or Doors NO Change to Exterior Lot or Lot Coverage NO Ch…
Complete interior renovation and rear addition to an existing single-family residence along with an accessory dwelling unit.
Alteration Level 3 to existing garage. Addition above existing single story garage for new two-story garage as a detached accessory dwelling. Change in Use from SFD to Single Famil…
Change of use from a Single Family Home to a Single Family Home with Accessary Dwelling Unit. The cellar level to be converted into an accessary dwelling unit (ADU) including finis…
General interior renovations of detached single family residence with interior conversion and proposed ADU. A revision to permit #B2309764.
HISTORIC There is no work, alterations, or repairs being done to the property. Changing property use from a one family dwelling to a two family dwelling or one family dwelling w…
As built permit to reflect single family home with an accessory dwelling unit in the basement.
Adjacent trades that win work from these permits
Property management companies → An ADU permit is a rental unit that will need managing.